Case Studies
The Boost Platform™ is poised to create higher yields and achieve maximum returns for solar asset owners in the US and beyond.
Customers are moving very rapidly from a small proof-of-concept to large product deployment because the problems are universal, alternative solutions are absent, and the payback is very quick.
Yield improvements with the Boost Platform™ have already been confirmed at multiple test sites.

-
Solarlytics Rooftop
Northern California
Years Active:
2021-2022Yield Increase:
- 3.4% Daily Min
- 3.8% Average
- 4.7% Daily Max
Site Profile:
- 4 Strings, 4 Racks, Due South, 10 deg. elevation
- Jinko 275Wp
- Fronius 3.8kW
Instrumentation:
- 4 MUs, one per string
- 2 Systems installed on Target Strings
Process:
- Calibration: 2.5 Days
- Performance: 4 Days
-
Third Party Test Lab
Northern California
Years Active:
2022Yield Increase:
- 1.4% Daily Min
- 3.4% Average
- 4.0% Daily Max
Site Profile:
- 4 Strings, 1 Rack, Due South, 30 deg. elevation
- Yingli 235Wp
- Fronius 8.2kW
Instrumentation:
- 4 MUs, one per string
- 2 Systems installed on Target Strings
Process:
- Calibration: 4.5 Days
- Performance: 3+ Months
-
Commercial Customer
Northern California
Years Active:
2022Yield Increase:
- 2.2% Daily Min
- 6.1% Average
- 9.7% Daily Max
Site Profile:
- 60kW; 20 Strings
- Evergreen 190Wp
- Solectria 60kW
Instrumentation:
- 8 MUs, 3 Reference Strings, 5 Target Strings
- 1 System installed on 1 Target String (selected by the customer)
Process:
- Calibration: 7 Days
- Performance: 3+ Months

CONNECT AND COLLECT
BOOST Platform includes precise string level monitoring that provides uninterrupted, granular, string-level data.

ANALYZE
Solarlytics AI cloud engine utilizes machine learning to analyze the data from the string level monitoring system and provide the precise location of shading, damage, varying voltages, and more to continuously improve PV system performance. The data output can be monitored in real-time from any computer or mobile device.

ACT
Specific, predictive maintenance intel lowers O&M costs and increases PV plant yield.